Page 210 - Design of Solar Thermal Power Plants
P. 210

194         3. GENERAL DESIGN OF A SOLAR THERMAL POWER PLANT

            18. Maximum annual water consumption during project construction
                and total annual water consumption during project operation.
            19. Power plant construction period: In northwestern areas of China,
                the construction period of a 50 MW power plant normally does
                not exceed 30 months; whereas that of a 100 MW power plant
                normally does not exceed 42 months.
            20. Power plant operation period: Normally to be 25 years


                 3.6 DESCRIPTION OF GENERAL PARAMETERS
                               OF THE POWER PLANT

               Below are the items described in the overall technical parameters of an
            CSP plant; after completion of design, explanation to the following items
            shall be provided.
            1. Concentrator: Area and dimension of aperture of a single
               concentrator. Tracking modes include azimuth/altitude angle,
               working wind speed corresponding to open-loop/close-loop design
               precision, protective wind speed.
            2. Concentration field: Concentrating forms include parabolic trough
               and tower, etc. Maximum power projected on the receiver from
               the concentration field, concentration field aperture area.
            3. Receiver: Structural forms mainly include cavity-type, cylinder-
               type, and evacuated tube-type. Receiver water inlet temperature,
               receiver outlet pressure, receiver outlet temperature, receiver fluid
               flow rate.
            4. Steam turbine generator: Inlet steam pressure of steam turbine; inlet
               steam temperature of steam turbine; maximum temperature of
               condensate water; generator outlet voltage.
            5. Thermal storage: Thermal capacity, temperature, volume, necessary
               time for full-load power generation of steam turbine.
            6. Backup emergency power supply: power, AC uninterruptible power
               supply and 220 V DC power supply
            7. Power access: Voltage, transformer power
            8. Grid access: Voltage, current, and time period



                    3.7 CALCULATION OF ANNUAL POWER
                                    GENERATION


               In a regular project, it is normally the owner who firstly proposes to
            construct a power plant with an expected capacity, and the design unit
            shall calculate annual power generation of the power plant and
   205   206   207   208   209   210   211   212   213   214   215