Page 240 - Design of Solar Thermal Power Plants
P. 240

3.10 NOTICES FOR CONCENTRATION FIELD LAYOUT   223

           of the shape, height of the wall, and the distance between the wall and
           the concentration field; otherwise, the negative pressure area created by
           the wind striding over the wall may aggravate the dust accumulation
           in the concentration field.



           3.10 NOTICES FOR CONCENTRATION FIELD LAYOUT

              A concentration field serves as the unit for collecting, reflecting, and
           concentrating solar energy. During design of a heliostat field, attention
           shall be paid to the harms to its neighboring buildings and personnel. It is
           better not to construct any tall buildings on other directions around the
           tower besides the north direction in the concentration field.
              Road layout in the concentration field and the space between concen-
           trators shall be designed by considering the service request of equipment.
           For large-area heliostats, requirements for 20 t-level crane car land and
           road widths shall be fully considered; whereas for small-area heliostats,
           less large-scale transportation equipment is required for erection and
           hoisting. However, due to large quantity of mirrors, multiple linkage
           mechanisms and numerous fault points, the space necessary for frequent
           service shall also be fully considered.
              Concentrator in the concentration field has extremely high requirement
           on precision; a slight shaking may have an impact on the precision. Thus
           when analyzing the geological conditions of the concentration field,
           construction site shall be free of significant geologic hazards, such as
           earthquake and underground cave collapse. It shall be fully considered
           during the foundation design for the concentrator and receiver tower.
              Diameter and volume of the receiver tower shall be as small as
           possible. It is better to apply the scheme of steel structure tower that is
           permeable to light, which could minimize the shade caused the tower
           during functioning of the northward concentration field.
              Communication and power cables in the concentration field shall be
           rat-proof. By using rat-proof heavy-armored cables, cable costs will be
           greatly increased. For areas with severe rat problems, it is suggested to
           apply wireless communication to achieve the connection between the
           concentration field and the host computer.
              For a parabolic trough system, the concentration field has been inte-
           grated with the collector field; thus soil pollution caused by evacuated
           tube oil leakage and the respective safety preventive measures shall be
           fully considered. In order to facilitate the treatment for oil leakage and
           prevent the spilled materials from being spread, it is normally not
           suggested to perform any concrete or asphalt hardening on the ground