Page 148 - Enhanced Oil Recovery in Shale and Tight Reservoirs
P. 148

132                            Enhanced Oil Recovery in Shale and Tight Reservoirs


          According to the Sheng’s (2015d) simulation results, some years of primary
          depletion assists the subsequent production of oil by gas flooding and
          huff-n-puff gas injection. Meng and Sheng (2016a) proposed that in the
          huff-n-puff gas injection in gas condensate reservoirs, the puff time should
          be started when the gas rate at the end of puff period should be 10% of
          the gas rate in the beginning. It suggests that the first huff-n-puff cycle
          should be started when the primary oil rate is depleted to a low enough
          rate, for example, 10% of the initial rate. There is no criterion proposed
          in the literature.
   143   144   145   146   147   148   149   150   151   152   153