Page 43 - Estimator's Piping Man-Hour Manual 5E
P. 43

26   Section One-SHOP FABRICATION

                           90° WELDED NOZZLES
                                Labor For Cutting And Welding
                                   Carbon Steel Material
                                 NET MAN HOURS EACH
            Standard   Extra
             Pipe   Heavy Pipe               SCHEDULE NUMBERS
      Size  & OD Sizes  & OD Sizes
      Ins.   3/8" Thick  1/2" Thick  20   30   40   60   80   100   120   140   160
      1       1.8      1.9          --   1.8   ;;    1.9   — ­             2.7
      1-1/4   1.9      2.1               1.9         2.1        --   :;    3.1
      1-1/2   2.1      2.3    —          2.1         2.3                   3.5
      2       2.2      2.7    --    --   2.2   _ _   2.7   --   --    --   4.6
      2-1/2   2.4      3.3               2.4         3.3                   5. 1
      3       2.8      3.8    --    --   2.8   --    3.8   --   --         5.7
      3- 1/2   3.2     4.3               3.2         4.3              _ -
      4       3.5      4.9    --    --   3.5   --    4.9   --   6.1   —    7.5
      5       4.4      6.0    --    --   4.4  ..     6.0   --   7.5   --   9.3
              4.7      6.5               4.7         6.5        9.5   —  1 12,1
      8       5.3      7.5    5.3   5.3   5.3   7.0   7.5   10.2  , . 12.9   15,8   18.2
      10      6.0      8.7    6.0   6.0   6.0   8.7   10.7  1 13.9 | 17.9   23.1   27.8
      12      6.9      10.0   6.9   6.9   8.4   11.1   14.4 [ 19.9  24.3   29.4   33.2
      14 OD   7.9      11.5   7.9   7,9   9.8   13.6   19.2   24.5   29.3   33.0   40.6
      16 OD   9.0      12.9   9.0   9.0   12.9   17.1   22.7   30.9   35.1   38.8   46.9
      18 OD   9.8      13.8   9.8   12.8   16.2   21.6   25.5   37.4   41.5   45.0   58.7
      20 OD   11.0     15.5   11.0   15.5   18.9   27.6   30.0   43.3   47.3   51.6   65.9
      24 OD   12.0     16.8   12.0   18.0   23.5   35.3   39.0   55.0   59.0   66.0   77.1

         All Nozzles other than 90° should be charged at the man hours shown for 4o nozzles.
      Pipe Thickness: Wall thickness of the pipe used for the nozzle determines the man hours that
         will apply. For nozzle of double extra strong pipe thickness, use Schedule 160 man hours,
      Reinforcement: Man hours given above are for plain welded nozzles only. For use of Gusset
         plates, etc.,as stiffeners not for reinforcement,add 25% to the net man hours shown above.
         If reinforcement is required and produced by building up the nozzle weld, or by the use of
         reinforcing rings or saddles as specified, use man hours for 90° reinforced nozzles.

     Preheating: If specified or required by Codes, add for this operation. See man hours for pre­
         heating. The size and wall thickness of header (not the size of the nozzle) determines the
         preheating man hours.
      Stress Relieving: Stress relieving of welds in carbon steel material is required by the A. S. A.
         Code for Pressure Piping, where the wall thickness is 3/4" or greater. The size and wall
         thickness of the header determines the man hours to be used for stress relieving.
         All pipe sizes shown below the ruled line are 3/4" or greater in wall thickness and must be
         stress relieved. Where stress relieving is required an extra charge should be made. See
         man hours for stress relieving.
      For Genera] Notes on welding, see pages 20 and 23.
   38   39   40   41   42   43   44   45   46   47   48