Page 51 - Estimator's Piping Man-Hour Manual 5E
P. 51

34  Section One-SHOP FABRICATION






                                       All Labor
                                  Carbon Steel Materials
                                 NET MAN HOURS EACH
     Nora.   Standard   Extra                 SCHEDULE NUMBERS
      Pipe   Pipe    Heavy Pipe                                         XX Hy.
      Size   & OD Sizes   & OD Sizes                                      or
      Ins.   3/8" Thick   1/2" Thick   40   60   80   100   120    140    160
      1-1/2   0.8       0.9      0.8    --     0.8    ..     --    --     2.0
                                                      _ _
      2       1.0        1.1      1.0   -_     1. 1   _ _    --    --     3.0
                                                             _ _
                                        _ _
      2-1/2   1. 1      1.3       1. 1         1.3                        3.7
                                                      _ _
      3       1.3        1.6      1.3   _ _    1.6           _.           3.9
                                                                          _ _
      3-1/2   1.4        1.8      1.4   —      1.8    --     --    --
     4        1.6       2. 1      1.6   ..     2.1    ._     4.9   ..     5.2
      5       2.0       2.5       2.0   ..     2.5    ..     6.5   ..     6.9
                                        _ _
      6       2.3       2.9       2.3          2.9    ..     8.1   --     8.9.
      8       3.1       4.0       3.1   --     4.0    7.5   10.6   12.5   13.2
      10      3.9       5.0       3.9   5.0    8.7   10.8   18.1         20.9
      12      4.7       6. 1      5.7   6.5   11.0   16.0   24.2   19.5   28.6
      14      5.6       7.3      6.8    8.4   12.8   17.7   27.9   26.4   39.2
      1.6     6.3       8.2      8.2    10.6   14. 1   19.9   32.1   37.7   49.8
      18      7.6       9.6      11.8   13.7   18.5   25.1   36.3   47.5   60,4
      20      8 2       10.6     14.2   16.8   22.9   30.3   40.5   57.3   ..
              O. i
      24      9.0       12.6     16.6   19.9   27.3   35.7   44.2   67.0   .­

      Pipe Thickness: Wall thickness of pipe determines the man hours that will apply. For double
         extra strong pipe thickness use Schedule 160 man hours.
      Construction: End closures as such are shop fabricated closures; orange peel, saddle, or flat
         plate type.
      Preheating:  If. specified or required by Codes, add for this operation. See man hours for pre­
         heating.
      Stress Relieving: Stress relieving of welds in carbon steel material is required by the A.S. A.
         Code of Pressure Piping where the wall thickness is 3/4" or greater.
         All sizes of butt welds shown below the ruled lines are 3/4" or greater in wall thickness
         and must be stress relieved, if the end closure involves a circumferential weld.
         Where stress relieving is required, an extra charge should be made. See man hours for
         stress relieving.
      Unlisted Sines: Unlisted sizes take the next higher listing.
   46   47   48   49   50   51   52   53   54   55   56