Page 89 - Estimator's Piping Man-Hour Manual 5E
P. 89

72   Section One-SHOP FABRICATION

                                ACCESS HOLES


                                  Carbon Steel Material

                                 NET MAN HOURS EACH
                                        WALL THICKNESS
         Nominal
          Pipe                    Over        Over        Over        Over
          Size       Uptol"      I"to2"     2 "to 2- 1/2"   2- 1/2 "to 4"   4 "to 6"
        2-1/2,3,4     1.6         .1.7                     --          ..
          5, 6, 8     1.8         1.9         2.3          --          -
          10, 12      1.9         2.1         2,5         3.5          ..
        14, 16, 18    2.0         2.2         2.6         3.7          -
        20, 22, 24    2.2         2.5         2.7         3.9         5.9

        26,28,30      2.5         2.8         2.9         4.2         6.3
        32, 34, 36    2.7         2.9         3.2         4.4         6.6
        38, 40, 42    2.9         3.2         3.5         4.9         7.3
        44, 46, 48    3.2         3.5         3.8         5.8         8.8
         54,60        4.0         4.3         4.7         7.2         10.9

     Man hours include access holes through 1" diameter (drilled and tapped) for radiographic inspection of welds when
     specified or required.
     For openings larger than I" in diameter add 25% to the above man hours for each 1/4" increase in diameter.

     If plugs are to be included and seal welded, add 0.5 man hours each.
   84   85   86   87   88   89   90   91   92   93   94