34  Section One-SHOP FABRICATION






                                       All Labor
                                  Carbon Steel  Materials

                                 NET MAN HOURS EACH
     Nora.  Standard   Extra                  SCHEDULE  NUMBERS
      Pipe   Pipe    Heavy Pipe                                         XX Hy.
      Size  & OD Sizes  &  OD Sizes                                       or
      Ins.  3/8"  Thick  1/2"  Thick  40  60   80     100   120    140    160

      1-1/2   0.8       0.9      0.8    --     0.8    ..     --    --     2.0
                                                      __
      2       1.0        1.1      1.0   -_     1. 1   __     --    --     3.0
                                                             __
                                        __
      2-1/2   1. 1      1.3       1. 1         1.3                        3.7
                                                      __
      3       1.3        1.6      1.3   __     1.6           _.           3.9
                                                                          __
      3-1/2   1.4        1.8      1.4   —      1.8    --     --    --
     4        1.6       2. 1      1.6   ..     2.1    ._     4.9   ..     5.2
      5       2.0       2.5       2.0   ..     2.5    ..     6.5   ..     6.9
                                        __
      6       2.3       2.9       2.3          2.9    ..     8.1   --     8.9.
      8       3.1       4.0       3.1   --     4.0    7.5   10.6   12.5  13.2
      10      3.9       5.0       3.9   5.0    8.7   10.8   18.1         20.9
      12      4.7       6. 1      5.7   6.5   11.0   16.0   24.2   19.5  28.6
      14      5.6       7.3      6.8    8.4   12.8   17.7   27.9   26.4   39.2
      1.6     6.3       8.2      8.2    10.6  14. 1  19.9   32.1   37.7   49.8
      18      7.6       9.6      11.8   13.7  18.5   25.1   36.3   47.5   60,4
      20      8 O. i 2  10.6     14.2   16.8   22.9   30.3  40.5   57.3   ..
      24      9.0       12.6     16.6   19.9   27.3  35.7   44.2   67.0   .-

      Pipe  Thickness:  Wall  thickness  of  pipe  determines  the  man hours  that  will apply.  For double
         extra  strong  pipe  thickness  use Schedule 160 man hours.
      Construction:  End closures  as  such  are  shop  fabricated  closures; orange peel, saddle, or  flat
         plate type.
      Preheating:  If.  specified  or  required  by Codes, add  for  this  operation.  See  man hours  for pre-
         heating.

      Stress  Relieving:  Stress  relieving  of welds  in carbon  steel material  is  required by the A.S. A.
         Code  of Pressure  Piping where the wall thickness  is 3/4" or  greater.
         All  sizes  of  butt  welds  shown  below the  ruled lines  are  3/4" or  greater  in wall  thickness
         and  must be stress  relieved, if the  end closure  involves a circumferential weld.
         Where  stress  relieving  is  required, an  extra  charge  should  be made.  See man hours for
         stress  relieving.
      Unlisted  Sines:  Unlisted sizes take the next higher listing.