                            Watershed  Management  SDWA  Develop  watershed  description  Identify   detrimental   characteristics  Conduct  risk assessment  Develop    detrimental  activities   control plan









                               Lake Restoration  CWA  Describe  environmental  conditions  Conduct   diagnostic survey  Conduct  feasibility study  Develop   recommended   plan  Develop  implementation  plan
















                            Nonpoint  Source Control  CWA  Analyze existing  conditions  Collect and   analyze data  Identify and rank   problems  BMPs  Screen  Select BMPs  Develop   recommended  plan  Develop  implementation  plan  1993).











                            Water  Management  Storm Water   Permit Rule,  Describe existing         management   implementation


                            Storm                conditions    Collect and   analyze data  Developing  alternatives  Assess  alternatives  Develop   plan  Develop  plan  Safe Drinking Water Act.





                       Planning Approaches Defined in Regulatory Programs
                               CSO Facilities  National CSO   Strategy  Describe existing   conditions  Collect and   analyze data  Develop  alternatives  Assess  alternatives  Develop   recommended   plan  Develop  implementation  plan  Clean Water Act; SDWA   U.S. Environmental Protection Agency (Urban Runoff Pollution Prevention and Control Planning,














                            Engineering  Facilities  National   Environmental  Policy Act  Describe existing  system  Develop planning   criteria  Collect and   analyze data  Develop  alternatives  Assess  alternatives  Develop   recommended  plan  Develop  implementation  plan  combined sewer overflow; CWA














                       Table 12.3  Project Type  Regulatory   basis  Determining  existing  conditions  Quantifying   pollution sources   and water   resource impacts  Assessing  alternatives  Developing and   implementing the   recommended plan  CSO    Source:












                                                                                                                                     403
   439   440   441   442   443   444   445   446   447   448   449