Page 596 - Fair, Geyer, and Okun's Water and wastewater engineering : water supply and wastewater removal
P. 596

JWCL344_ch14_500-554.qxd  8/7/10  8:56 PM  Page 552







                    552  Chapter 14  Design of Sewer Systems

                                                                                                          Inlet 2
                                                                     A                B           D
                                               Length of storm sewers
                              Area 1
                                               MH 1 - MH 2  120 m
                                               MH 2 - MH 3  180 m
                                                                                        Sewer 1       Sewer 2
                                                                               A1
                                               MH 3 - Stream 100 m
                                     Inlet
                                                                                       A2
                                                                    Inlet 1
                                     MH 1
                                                                                  C               E
                                                  Area 2
                                                                    Figure 14.41 Layout of Storm Drainage for Problem 14.24.
                                     MH 2
                                                                    Area       From         To        Inlet Time, min
                                       Inlet
                                                                    A1          A          Inlet 1          5
                                                                                C          Inlet 1          4
                                                                    A2          B          Inlet 2         10
                                                                                C          Inlet 2         12

                                                                    The rainfall intensity i (mm/h) as a function of rainfall duration
                                                  MH 3
                                                                    t (min) is:
                                                            Stream
                                                                                          2,500
                                                                                       i =
                                                                                          t + 18
                                Area 3
                                                                    Determine the following:
                                                Outlet sewer
                                    Inlet                               (a) Overall runoff coefficient c for both areas combined.
                                                                        (b) Concentration times Area 1 at Inlet 1
                                                                        (c) Concentration time for Area 2 at Inlet 2
                    Figure 14.40 Layout of Storm Drainage for Problem 14.23.
                    Conversion factor: 1 m   3.2808 ft                  (d) Concentration time for Sewer 2
                                                                        (e) Flow entering Inlet 1
                                                                        (f) Flow entering Inlet 2
                                                                        (g) Flow in Sewer 2
                        • Runoff coefficient c   0.30.                  (h) Minimum nominal diameter of Sewer 2
                        • The velocity in the storm sewers from MH 1 to MH 3  (i) Maximum nominal diameter of Sewer 2
                          is 0.75 m/s.
                                                                    14.25  Determine the sizes of the three storm sewers needed to
                        • Manning coefficient n for sewers   0.013.
                                                                    serve the 4.8 ha drainage areas shown in Fig. 14.42. Each area
                        • Ground elevation at MH 3   625.00 m
                                                                    has an inlet time of 10 min. The distance between manholes is
                        • Invert elevation of outfall sewer at MH 3   622.00 m
                        • Ground elevation at edge of stream   624.00 m
                        • Bottom elevation of stream   614.00 m
                        • Maximum water level in stream   620.50 m                     MH 3                Housing
                                                                            1                  2           area
                        (a) Determine the required size of the outfall sewer so
                                                                                   Inlet
                           that no backflow of water from the stream into the
                           sewer is possible.
                                                                                                 Inlet
                        (b) What size of outfall sewer will be required if exca-                 MH 2
                                                                      Housing area
                           vation is to be kept to a minimum? In this case                                 Park
                           assume that there is no minimum limit on depth of                 3
                           cover.
                    14.24  Storm sewers 1 and 2 are planned to carry the
                    stormwater runoff contributed by the two areas A1 and A2                     Inlet
                                               2
                    (see Fig. 14.41). Area Al is 15,000 m and has a runoff coeffi-               MH 1
                                               2
                    cient c 1   0.65. Area A2 is 25,000 m and has a runoff coeffi-
                                                                                           Storm sewer
                    cient c 2   0.45. Flow time in Sewer 1 is 2 min. Inlet times are
                    as follows:                                     Figure 14.42 Layout of Storm Drainage for Problem 14.25.
   591   592   593   594   595   596   597   598   599   600   601