Page 127 - Fluid Catalytic Cracking Handbook
P. 127

AI2O3  ppm  28.9  29.1  29.2  28.7  28.7  28.7  28.7  28.8  28.8  Sn  M  ppm  902  17  18  909  910  17  932  18  n  939  18  931  18  18  932  18  18


                                     70  72  69  68  70  69  67  71  69  130  130  130  130  130  132  131  130  130]
                                APS                         Z


                                     63  61  67  69  65  67  71  64  67  1.79  1,80  1.79  1.79  1.80  17 9  1.79  1.76
                                0-80  wt%                   RE203

                                     10  7  8  9  6  9  10  7  10    440 ' 24.27 r TM  24.25  24.27  24.27
                                0-40  wt%                   UCS  24.27

                                     0  0  0  2  0  0  2  0  4   416  446  445  458  432  409
                                0-20  wt%                   Sb  ppm     24 r™44 i  23 [_ 420



                                ABD  0.83  0.83  0.84  0.83  0.83  0.84  0.85  0.85  0.84  Cu  ppm  25  23  24  24  24  25  24  Figure 3-12. Typical E-cat analysis.



                                P.V. m2/gm, cc/gm gm/cc  0.30  0.28  0.29  0.29  0.28  0,29  0.28  0.29  0.28  Ni  ppm  1997  1948  1940  1974  1942  1910  1893  L_J885  1873



                                S.A.  147  148  147  148  148  150  148  148  148  V  ppm  4106  4093  4051  4099  4017  3962  3892  3893  3875


                                     2.2  1.9  3.1  2.6  3.2  2.6  2.3  2.8  2.9  0.23  0.23  0.16  0.23  0.22  0.20  0.24  0.15  0.24
                                G.F.                        C  wt%


                                     1.3  1.2  1.2  1.3  1.4  1.3  1.2  1.4  1.2  5600  5600  5600  5600  5600  5600  5600  5600  5600
                                C.F.                        Fe  ppm
                           E-Cat Data  %  Date MAT  69  69  70  69  68  69  69  67  70  Na  ppm  4900  4800  4600  4600  4800  4600  4800  4600  4500




                                Sample  11/7/94  11/10/94  11/14/94  11/21/94  11/24/94  11/28/94  12/1/94  12/5/94  12/12/94  11/7/94  11/10/94  11/14/94  11/21/94  11/24/94  11/28/94"  12/1/94  12/5/94  12/12/94
   122   123   124   125   126   127   128   129   130   131   132