8'-6" 4 spaces @ 7'-6" C-C  4'-6" 10 spaces @ 8'-0" C-C  80'-0"  30'-0"  28  27  26  25  24  23  22  21  20  19  18  17  16  15  4'-6"  29  30  W14 159  24'-0"  31  3 spaces  @ 8'-0" C-C  W14 99  32  HP14 73 (typ)  33  W14 109  34  HP10 42* (typ)  35  W14 90  36  W14 159  37  HP11 42 (typ)  38 W27 146  39

            13  14  N                                     1'-0"  63  64  8'-6"
            12                        Spacer length  36"  38"  40"  24"  24"  W14 159  65  1990 Excavation Collapse at 14th & H Streets, N.W., Washington, D.C. report, May 1991.)
            11                                         40" = drop  HP14 73  66  4 spaces  @ 7'-0" C-C  28'-0"
            10  9  HP14 89  All lacings (dashed lines) are structural tubing  Soldier beams #7 through #71  are HP 14 73,  Spacer size   W12 53  HP12 63  HP12 63  HP12 63  HP8 36  67  68  6'-6"
          9 spaces @ 8'-0" C-C  72'-0"  8  7  HP8 36  Top tier elevation is +50', except at soldier beams #64 through #71, the elevation is  except #34, #36, #37, #38, #39, #40, #43, and #46, which are HP12 74.*  Spacer (outlooker) schedule:*  HP8 36  69  70  71  3 spaces  6'-0" @ 7'-0" C-C  21'-0"






            5  6   Top tier frame:  assumed at +44.  5 5  5 /16"  Soldier pile no.   #7 thru #28   #29 thru #48   #49 thru #57   #58 thru #67   #68 thru #71   * Based on field observations.  Scale: 1"= 25'  72  73  74
          7'-0"  4    (1)   (2)   (3)   (4)                   75  3 spaces  @ 7'-0" C-C  21'-0"
          6'-0"  3                                            76        FIGURE 10.3
                                                                2'-6"










                                       10.25