Page 337 - Forensic Structural Engineering Handbook
P. 337

29  4'-6"  30  24'-0"  31  3 spaces  @ 8'-0" C-C  32  33  34  35  36  37  38  39  40  77'-0"  41  42  11 spaces @ 7'-0" C-C   43  44  8'-0" C-C  45  46  40'-0"  47  5 spaces  48  4'-6" @ 8'-0" C-C
          4'-6"  28                                           49  4'-6"
            27                                                50
            26                   W14 159  W27 146             51
            25  24            W14 90     W14 143*  W14 90     52  53
          10 spaces @ 8'-0" C-C  80'-0"  23  22  W14 109  HP14 89  54  55  10 spaces @ 8'-0" C-C  80'-0"





            20  21  W14 159  W14 99  HP14 73 (typ)  HP10 42* (typ)  HP11 42 (typ)  W12 53 (typ)  W14 193*  56  57
            19  18                                            58  59    Washington excavation. (Continued) (c) Top tier of internal bracing. (From OSHA Investigation of November 19,
          8'-6" 4 spaces @ 7'-6" C-C  30'-0"  17  16  15  1'-0"  60  61  62  4 spaces  @ 7'-6" C-C  30'-0"  (c)






            13  14  N                                     1'-0"  63  64  8'-6"
            12                        Spacer length  36"  38"  40"  24"  24"  W14 159  65  1990 Excavation Collapse at 14th & H Streets, N.W., Washington, D.C. report, May 1991.)
            11                                         40" = drop  HP14 73  66  4 spaces  @ 7'-0" C-C  28'-0"
            10  9  HP14 89  All lacings (dashed lines) are structural tubing  Soldier beams #7 through #71  are HP 14 73,  Spacer size   W12 53  HP12 63  HP12 63  HP12 63  HP8 36  67  68  6'-6"
          9 spaces @ 8'-0" C-C  72'-0"  8  7  HP8 36  Top tier elevation is +50', except at soldier beams #64 through #71, the elevation is  except #34, #36, #37, #38, #39, #40, #43, and #46, which are HP12 74.*  Spacer (outlooker) schedule:*  HP8 36  69  70  71  3 spaces  6'-0" @ 7'-0" C-C  21'-0"





            5  6   Top tier frame:  assumed at +44.  5 5  5 /16"  Soldier pile no.   #7 thru #28   #29 thru #48   #49 thru #57   #58 thru #67   #68 thru #71   * Based on field observations.  Scale: 1"= 25'  72  73  74
          7'-0"  4    (1)   (2)   (3)   (4)                   75  3 spaces  @ 7'-0" C-C  21'-0"
          6'-0"  3                                            76        FIGURE 10.3
                                                                2'-6"










                                       10.25
   332   333   334   335   336   337   338   339   340   341   342