DESIGN-CONSTRUCTION PROCESS 1.47
TABLE 1.3 Council of American Structural Engineers Drawing Review Checklist (Continued)
Project: Project Manager: Reviewer:
Project No.: Engineer: Date:
Item Yes No N/A Comment
Z. Are diagonal bars provided at
openings in walls, floors, and roof?
AA. Have construction joints been pro-
vided for stairs so they may be con-
structed after floors are in place?
AB. Is reinforcing on proper face for
walls and slabs?
XI. Masonry Construction
A. Is value of f ′ specified?
m
B. Are control joints spaced as
required?
C. Will all walls with reinforcing have
cells at least 2 in 2 in? Are cells
with reinforcing filled with grout,
not mortar?
D. Are bar laps specified?
E. Are lintel details provided for all
openings?
F. Have wall cores been solidly
grouted at jambs?
G. Have details of nonstandard construc-
tion been provided, e.g., bond beam
intersections at different levels?
H. Are locations of intermediate bond
beams shown on sections and wall
elevations?
I. Has steel angle lintel schedule been
used?
J. Are shelf angels required for brick?
Properly located and anchored?
K. Are anchors for floor/roof joists,
beams, etc., properly located and
detailed?
L. Are control joints placed beyond
lintel bearings to allow for arching?