TABLE 1.4 Council of American Structural Engineers Submittal Review Checklist


           Project:         Project Manager:        Reviewer:
           Project No.:     Engineer:               Date:



                         Item               Yes   No  N/A       Comment

            I. General
             A. Is general contractor’s review stamp
                present and signed on all sheets?
             B. Have all sheets been entered into
                submittal log?
             C. Have all sheets been reviewed for
                general completeness immediately
                upon receipt?
             D. Have dimensions given on struc-
                tural drawings been verified on
                submittals?
             E. Have any unusual or questionable
                conditions been reviewed by a
                senior engineer?
             F. Have all submittals required by
                contract documents been provided?
             G. Do general notes on shop drawings
                agree with structural drawings and
                specifications?
             H. Have submittals been
                reviewed/returned within firm’s
                general policy time period?
            II. Concrete Formwork (if Required)
             A. Has dimensional layout of elements
                been reviewed?
             B. Have shoring/reshoring require-
                ments been submitted for informa-
                tion purposes?
            III. Mild Reinforcing
             A. Have size, quantity, spacing, and
                layout been reviewed?
             B. Has steel grade(s) been reviewed?
             C. Have lap lengths, stagger, and loca-
                tions been reviewed?
             D. Have reinforcing lengths been spot-
                checked?