Page 76 - Forensic Structural Engineering Handbook
P. 76
TABLE 1.4 Council of American Structural Engineers Submittal Review Checklist (Continued)
Project: Project Manager: Reviewer:
Project No.: Engineer: Date:
Item Yes No N/A Comment
C. Are steel grades correct?
D. Are span conditions (1, 2, or 3
spans) correct?
E. Is deck finish correct?
F. Are deck supports and side lap
welds and fasteners correct?
G. Are pour stop gages, type, and
dimensions correct?
H. Are all details consistent with struc-
tural drawings?
I. If deck shoring is required, is it
shown?
J. Is required reinforcing shown at
openings?
K. If required by contract documents,
is deck supplier a member of SDI?
L. Are all overhang conditions
adequate or otherwise in conformance
with structural drawings?
M. Are necessary accessories (closures,
ridge/valley plates, clips, and
straps) indicated?
N. Are all opening requirements
indicated and coordinated with
architectural, mechanical, and
electrical drawings?
IX. Timber
A. Glulam lumber
1. Are sizes and configurations
correct?
2. Are lumber grades and grading
method consistent with struc-
tural drawings?
3. Are pressure treatments correct?
4. Are cambers correct?
5. Are connections consistent with
structural drawings?
1.57