Page____of____ 3 rd Submission Date Retd. Action
SHOP DRAWING REVIEW ACTION No exceptions taken Make corrections noted Amend and resubmit Rejected, see Remarks Reviewed only for loads imposed on the structure Date Date Rcvd. Retd.
2 nd Submission
C
D
E
A
B
Date Action Rcvd.
Date Retd.
1 st Submission Action
Date Rcvd.
Consultant’s Shop Drawings Log DETAILER: Title
TABLE 1.5 PROJECT: PROJECT#: TRADE: DWG. #