Page 79 - Forensic Structural Engineering Handbook
P. 79

Page____of____            3 rd  Submission  Date  Retd.  Action
                  SHOP DRAWING REVIEW ACTION  No exceptions taken  Make corrections noted  Amend and resubmit  Rejected, see Remarks  Reviewed only for loads imposed on the structure  Date  Date  Rcvd.  Retd.












                                        2 nd  Submission

                          C
                            D
                               E
                     A
                       B
                                            Date  Action  Rcvd.


                                            Date  Retd.
                                        1 st  Submission  Action





                                            Date  Rcvd.





          Consultant’s Shop Drawings Log  DETAILER:  Title















          TABLE 1.5      PROJECT:  PROJECT#:  TRADE:  DWG. #





                                       1.59
   74   75   76   77   78   79   80   81   82   83   84