TABLE 1.4 Council of American Structural Engineers Submittal Review Checklist (Continued)


           Project:         Project Manager:        Reviewer:
           Project No.:     Engineer:               Date:



                         Item               Yes   No  N/A       Comment

                 6. Have lengths been spot-checked?
                 7. Are elevations correct?
                 8. If required, are certified calcu-
                   lations consistent with shop
                   drawings?
                 9. If required, are certified shop
                   drawings provided?
                10. If required, is an AITC certifi-
                   cate present on drawings?
             B. Wood Trusses
                 1. Are sizes, spacings, and config-
                   uration correct?
                 2. Are accompanying calculations
                   using the proper loadings on top
                   and bottom chords?
                 3. Do shop drawings indicate
                   proper loadings?
                 4. Have concentrated loads been
                   verified with all drawings
                   (architectural, mechanical, elec-
                   trical)?
                 5. Have lengths been spot-checked?
                 6. Are all shop drawing general
                   notes consistent with contract
                   documents?
                 7. Are connector plate sizes
                   indicated?
                 8. Is end bearing condition
                   detailed?
                 9. Is bracing shown and detailed?
                10. Are wood species and treatment
                   as specified?
                11. Are submittals sealed and certi-
                   fied by licensed engineer in
                   appropriate state?