Page 77 - Forensic Structural Engineering Handbook
P. 77
TABLE 1.4 Council of American Structural Engineers Submittal Review Checklist (Continued)
Project: Project Manager: Reviewer:
Project No.: Engineer: Date:
Item Yes No N/A Comment
6. Have lengths been spot-checked?
7. Are elevations correct?
8. If required, are certified calcu-
lations consistent with shop
drawings?
9. If required, are certified shop
drawings provided?
10. If required, is an AITC certifi-
cate present on drawings?
B. Wood Trusses
1. Are sizes, spacings, and config-
uration correct?
2. Are accompanying calculations
using the proper loadings on top
and bottom chords?
3. Do shop drawings indicate
proper loadings?
4. Have concentrated loads been
verified with all drawings
(architectural, mechanical, elec-
trical)?
5. Have lengths been spot-checked?
6. Are all shop drawing general
notes consistent with contract
documents?
7. Are connector plate sizes
indicated?
8. Is end bearing condition
detailed?
9. Is bracing shown and detailed?
10. Are wood species and treatment
as specified?
11. Are submittals sealed and certi-
fied by licensed engineer in
appropriate state?
1.58