TABLE 1.3 Council of American Structural Engineers Drawing Review Checklist (Continued)


           Project:         Project Manager:        Reviewer:

           Project No.:     Engineer:               Date:



                         Item               Yes   No  N/A       Comment

             Q. Provided supplementary reinforc-
                ing at wall penetrations and
                interruptions?
             R. Compare wall steel and wall height.
                Is more steel required for higher
                walls?
             S. Does foundation wall require steel
                in both faces?
             T. Are expansion joints in stems of
                retaining walls shown?
             U. Are backfill and drainage fill prop-
                erly indicated?
            VIII. Drilled Piers
             A. Pier diameter shown?
             B. Bell diameter shown?
             C. Pier vertical reinforcing:
                1. Size, quantity, and length shown?
                2. Splices permitted?
                3. Staggered?
                4. Splices required?
                5. Dowels—size, quantity, length,
                  and embedment length into
                  pier—shown?
             D. Dowel or anchor bolt template
                details shown?
             E. Top of pier elevation noted?
             F. Pier bid quantities established?
             G. Pier cap size and reinforcement
                determined?
             H. Test holes—reference made to
                geotechnical?
             I.  Typical pier details shown?
            IX. Pile Foundations
             A. Are pile specification requirements
                and pile sizes given in notes?