TABLE 1.3 Council of American Structural Engineers Drawing Review Checklist (Continued)


           Project:         Project Manager:        Reviewer:
           Project No.:     Engineer:               Date:



                         Item               Yes   No  N/A       Comment

             B. Verified property line dimensions
                on site plan against architectural
                drawings?
             C. Verified column lines on structural
                and architectural drawings?
             D. Verified all column locations and
                orientation are same on structural
                and architectural drawings?
             E. Verified perimeter slab on structural
                matches architectural?
             F. Verified all depressed or raised
                areas of slabs are indicated?
             G. Verified slab elevations?
             H. Verified perimeter roof line and
                slope with architectural roof plan?
             I.  Verified all expansion joint loca-
                tions against architectural drawing?
             J.  Verified location of control joints in
                walls?
             K. Checked architectural drawings for
                lintels that are required, particularly
                in non-load-bearing walls?
             L. Checked for folding suspended par-
                titions and their support?
             M. Designed stairs and landings and
                coordinated with architect?
             N. Coordinated elevator cells
                1. Shelf angles
                2. Divider beam
                3. Max. spacing of guiderail supports
                4. Hoist beam in penthouse
                5. Elevator beams
             O. Coordinated wall sections?
             P. Verified that brick ledges are prop-
                erly shown?




                                          1.40