TABLE 1.3 Council of American Structural Engineers Drawing Review Checklist (Continued)
Project: Project Manager: Reviewer:
Project No.: Engineer: Date:
Item Yes No N/A Comment
F. Are dowels, brackets, and keys pro-
vided for future expansion in scope
of work?
G. Is nomenclature used throughout all
drawings and specifications?
H. Is list of abbreviations shown?
I. Are floor and roof elevations given?
VI. Preengineered Building
A. Is a note included that foundations
for preengineered buildings or for
equipment shall not be placed until
design loads and anchor bolt sizes
and arrangement have been submit-
ted on shop drawings and approved?
B. Is the MBMA Design Practices
Manual referenced for metal
buildings?
C. Are metal buildings required to be
designed for unusual dead loads
such as ventilation equipment,
sprinkler system piping, ceilings,
cranes?
D. Is erection under observation of
engineer of record or other regis-
tered engineers?
E. Are design reactions shown on
plan?
F. Is manufacturer required to submit
loads for building?
G. Is it noted that shear devices are to
be provided by metal building
manufacturer?
H. Is it noted that anchor bolt size,
length, and location must be pro-
vided by metal building
manufacturer?
1.42