Be st Practice 6 .10          Gas Turbine Best Practices


         Best
         Best
         Best
         Best Practice 6.10Practice 6.10Practice 6.10Practice 6.10
         Require the installation of a torquemeter to allow accurate
         calculation of gas turbine efficiency.              Lessons Learned
           Calculation of gas turbine efficiency requires the calculation of the  Gas turbine efficiency calculations will be erroneous and
         driven equipment power.                            inconclusive in determining maintenance cycles when
           This calculation can be inaccurate, due to the many variables  torquemeters are not installed.
         involved in determining the driven equipment power.
           Requiring a torquemeter during the project phase will ensure  Benchmarks
         accurate gas turbine efficiency calculations.       The installation of torquemeters has been recommended as part of
           Torquemeters can be installed in existing trains but will require:  project specifications since 1995. This action has resulted in the ac-
           Rotor response study                             curate determination of critical (un-spared) gas turbine maintenance
           Torsional study                                  cycles and significant extension of these cycles.
           Coupling and coupling guard modifications





       B.P. 6.10 Supporting Material

       Please refer to material in B.P: 6.2.