Page 15 - Fundamentals of Reservoir Engineering
P. 15
CONTENTS XV
EXERCISES
EXERCISE 1.1 GAS PRESSURE GRADIENT IN THE RESERVOIR 23
EXERCISE 1.2 GAS MATERIAL BALANCE 33
EXERCISE 2.1 UNDERGROUND WITHDRAWAL 50
EXERCISE 2.2 CONVERSION OF DIFFERENTIAL LIBERATION DATA TO GIVE THE
63
FIELD PVT PARAMETERS B o, R s AND B g
EXERCISE 3.1 SOLUTION GAS DRIVE; UNDERSATURATED OIL RESERVOIR 79
EXERCISE 3.2 SOLUTION GAS DRIVE; BELOW BUBBLE POINT PRESSURE 80
EXERCISE 3.3 WATER INJECTION BELOW BUBBLE POINT PRESSURE 85
EXERCISE 3.4 GASCAP DRIVE 87
EXERCISE 4.1 UNITS CONVERSION 108
EXERCISE 6.1 WELLBORE DAMAGE 142
EXERCISE 7.1 ei-FUNCTION: LOGARITHMIC APPROXIMATION 154
EXERCISE 7.2 PRESSURE DRAWDOWN TESTING 157
EXERCISE 7.3 DIMENSIONLESS VARIABLES 162
EXERCISE 7.4 TRANSITION FROM TRANSIENT TO SEMI-STEADY STATE FLOW 166
EXERCISE 7.5 GENERATION OF DIMENSIONLESS PRESSURE FUNCTIONS 184
EXERCISE 7.6 HORNER PRESSURE BUILDUP ANALYSIS, INFINITE RESERVOIR
CASE 200
EXERCISE 7.7 PRESSURE BUILDUP TEST ANALYSIS: BOUNDED DRAINAGE
VOLUME 202
EXERCISE 7.8 MULTI-RATE FLOW TEST ANALYSIS 211
EXERCISE 7.9 AFTERFLOW ANALYSIS TECHNIQUES 231
EXERCISE 8.1 MULTI-RATE GAS WELL TEST ANALYSED ASSUMING STABILIZED
FLOW CONDITIONS 265
EXERCISE 8.2 MULTI-RATE GAS WELL TEST ANALYSED ASSUMING UNSTABILIZED
FLOW CONDITIONS 272
EXERCISE 8.3 PRESSURE BUILDUP ANALYSIS 282
EXERCISE 9.1 APPLICATION OF THE CONSTANT TERMINAL PRESSURE SOLUTION307
EXERCISE 9.2 AQUIFER FITTING USING THE UNSTEADY STATE THEORY OF HURST
AND VAN EVERDINGEN 310