3.4 Casing and Cementation  135







                                       Top plug








                                       Rupture disk


                                        Bottom plug








                                        High-strength
                                        non-rotating
                                        plate


                                        Sure-Seal 3
                                        float collar













                         Figure 3.16  Two-plug system. (Courtesy of Weatherford, 2008. Cementing Products.)

                           Care also has to be taken not to fracture the rock when pumping (high viscous)
                         cement slurries through narrow annuli, because the circulation pressure in the
                         annulus is acting on the bottom together with the ‘‘hydrostatic head’’ of the mud
                         and slurry column.
                           In general, it is recommended to calculate the ECD by a computer simulation
                         of critical cement jobs, taking into account rheology of the slurries and planned
                         pump rates.