required power output.


               Calculation Procedure:


               1. Determine the type of hydraulic turbine suitable for this site
               Enter Fig. 1 on the left at the available head, 65 ft (20 m), and project to the
               right to intersect the vertical projection from the required turbine output of
               10,000 kW (10 MW). These two lines intersect in the standardized tubular

               unit  region.  Hence,  such  a  hydroturbine  will  be  tentatively  chosen  for  this
               site.




































                          FIGURE  1  Traditional  operating  regimes  of  hydraulic  turbines.
                     New  designs  allow  some  turbines  to  cross  traditional  boundaries.
                     (Power.)



               2. Check the suitability of the chosen unit
               Enter Table  2  at  the  top  at  the  operating  head  range  of  65  ft  (20  m)  and

               project  across  to  the  left  to  find  that  a  tubular-type  hydraulic  turbine  with
               fixed blades and adjustable gates will produce 0.25 to 15 MW of power at 55
               to 150 percent of rated head. These ranges are within the requirements of this