Page 130 - How To Implement Lean Manufacturing
P. 130

How to Do Lean—Cultural Change Fundamentals         109


                       The science of SPC is designed so that when a process goes out of control (that is, a
                    plotted point on the control chart lies above the upper control limit or below the lower
                    control limit), we know with 99.73 percent certainty that the process has changed. It is
                    then a requirement that the cause of this change must be found and understood. These
                    causes have a unique name in the science of SPC. They are called special causes of varia-
                    tion. Then, if the special cause created an undesirable change (in this example, that would
                    be for the defects to increase and hence the plotted point would be above the upper con-
                    trol limit), you then have a problem to solve. However, if the special cause creates a desir-
                    able change, as in this case, the proper action is to standardize. See Fig. 6-3.
                       In this case, there are several possible solutions to this problem. However, the logical
                    one, consistent with the Company’s objectives at that time was to go to a single source
                    of circuit boards and purchase only boards from supplier C. A little more on that later.
                       Why did Francisco treat the change incorrectly? When a process goes out of control,
                    it means the process has changed. Well, entropy being what it is, the change is usually
                    bad, in the form of deterioration. In the preceding several months, since they had started
                    with SPC, Francisco had spent so much time chasing root causes of problems in which
                    the change had occurred in the “undesirable” direction that he understandably had
                    overlooked this “avalanche of diamonds” that was given to him. In this case, the change
                    signaled that some desirable change had occurred.
                       So Francisco and I investigated the process to find the root cause of the change …
                    and what we found was amazing.
                       This line had three different suppliers of circuit boards, which we shall call suppli-
                    ers A, B, and C. The process change that was seen on the control chart coincided to the
                    minute (taking into account the lead time) when a new batch of circuit boards was
                    introduced to the line. These boards were manufactured by supplier C. Upon further
                    investigation we found that all three suppliers met all quality standards but the hole
                    placements on supplier C’s boards had a Cpk (Process Capability Index) of 2.2, while
                    the Cpks for supplier A and B were 1.37 and 1.43, respectively. We found that, although
                    all three suppliers met the minimum standard of Cpk >1.33, supplier C was a superior
                    quality supplier. Since two suppliers barely met the spec and this created over 1 percent
                    scrap, it is only logical to conclude that the specification was too wide and should be
                    reduced; however, that was not our problem—at least not at that specific moment.
                       We had found the root cause of this “desirable effect”: The change to supplier C had
                    caused the reduction of defects. This reduction of defects was not a problem since it was



                                                                            Be happy.
                                                            Is the data
                         Plot the         Is the    No    out of control in  Yes   The process found
                       current data     data inside       a DESIRABLE       an improvement
                         point.         the limits?
                                                            direction?      idea for you...find the
                                                                            root cause and
                                                                            STANDARDIZE it.
                                            Yes                 No
                                  Then the process is      Then you have a
                                  in control and         problem...find the root
                                  remains stable.        cause and eliminate it.
                                  Be happy.


                    FIGURE 6-3  The logic of SPC.
   125   126   127   128   129   130   131   132   133   134   135