Page 317 - How To Implement Lean Manufacturing
P. 317

5
              4
              3
                 All key product  Significantly A shift is in place  All key product   reduced need  to eliminate the  and process  and process   to monitor  need to monitor  characteristics characteristics  the process;  processes and  are identified;   are identified;   robustness is  build in process  are stable and  most are stable;   built into the  robustness; the
              2                Cpk                      done            so on
                 “Critical” product   characteristics  identified; the   stability and   capability are   known for these;   many unknown   Mach availability   is unknown;   stock outs   unknown; most   maintenance  is reactionary;   line losses are   known; >8%, not   Firefighting only;   done by supers   and engrs. only;   little training;   few understand   variation







              1                  losses                   stratified               The Five Precursors to Lean—An Evaluation Matrix


                 Does  not meet   Level 1   criteria  Does  not meet   Level 1   criteria  Does  not meet   Level 1   criteria
              0





              Needed Trait  1 - High levels of   stability and quality in   both the product and   the processes  2 - Excellent machine   and line availability  3 - Talented problem   solvers, with a deep   understanding of   variation  TABLE 19-1







                                                                                    293
   312   313   314   315   316   317   318   319   320   321   322