Page 448 - Hydrocarbon Exploration and Production Second Edition
P. 448

Subject Index                                                         435


             Darcy equation, 166                   dog legs, 66
             Darcy’s law, 219                      dolomite, 108
             datum plane, 154                      draw works, 55
             dayrate contract, 81                  drill ships, 50
             DCD. See declaration of a commercial discovery  drill string, 54
             DCQ. See daily contract quantity      drilling
             de-bottlenecking, 395, 412              engineering, 47
             de-mobilisation cost, 79                extended reach, 69, 416
             de-oiling, 277                          jackets, 48
             de-sulphurisation, 285                  problems
             decision nodes, 196                      dogleg, 76
             decision trees, 196                      fishing, 77
             declaration of a commercial discovery, 13  lost circulation, 78
             decline, 205                             stuck pipe, 76
               curve analysis, 225                   slim hole, 71, 72
               period, 5, 205, 225                 drive
             declining balance method, 344           energy, 202
             decommissioning, 6, 419                 mechanism, 204, 217
               fund, 421                           dry gas, 119
               methods, 422                        dynamic positioning, 50
             deconvolution, 34                     dynamite charge, 32
             deductibles, 342
             deemed equity, 17                     economic
             definition phase, 326                    indicators, 349
             dehydration, 276                        life, 356
             deltaic environment, 99                 lifetime, 6, 349, 420
             demister, 274                           model, 338
             density, 267                          effluent, 313
             density logs, 153                     effluent streams, 313
             depletion, 119, 388                   EIA. See environmental impact assessment
               drive, 204                          EIS. See environmental impact statement
               isothermal, 116, 119                Ekofisk Field, 106, 134
               method. See unit of production method  electro-magnetic techniques, 24
               policy, 387                         emergency shutdown valves, 309
             depositional environment, 95, 98      EMS. See environmental management system
             depth control, 151                    emulsion, 277, 391
             desanders, 56                           behaviour, 267
             design procedures, 87                 energy density of gas, 211
             designer well, 69                     enhanced oil recovery, 226, 410
             desilters, 56                           chemical techniques, 226
             detailed design, 327                     polymer flooding, 226
             deterministic methods, 173               surfactant flooding, 226
             development, 3                          miscible processes, 227
               and lifting costs, 356                thermal techniques, 226
               appraisal, 3                           in-situ combustion, 226
               cost, 342                              steam drive, 226
               economics, 337                         steam soak, 226
               planning, 4, 231, 311               enhanced recovery, 6
               wells, 229                          enhancements, 397
             dew point, 116, 117, 121, 211         environment, 88, 278
             diagenesis, 105                       environmental impact assessment, 25, 60, 88, 400
             diagenetic healing, 103, 106          environmental impact statement, 90
             differential sticking, 76             environmental management system, 88
             diffractions, 30                      environments of deposition, 23
             dip, 158                              EOR. See enhanced oil recovery
             dipmetre, 153                         equipment, 269, 276
             discount                              equities, 17
               factor, 353                         equity
               rate, 353                             determination, 16, 17
             discounted cashflow, 351               equivalence, 26
             dissolution, 106                      ERD. See extended reach drilling
   443   444   445   446   447   448   449   450   451   452   453