Page 449 - Hydrocarbon Exploration and Production Second Edition
P. 449

436                                                            Subject Index


          ethane, 109                          fluid
          evacuation, 296                        contact, 133
          expansion reservoir fluids, 202         displacement, 217
          expectation curves, 180, 181, 183, 184  flow, 231
          expected monetary value, 198, 363      pressure, 133
          expenditure, 341, 342                  samples, 128, 387
          expenditure items, 341                 sampling, 151
          exploration, 2, 19                   folds, 104
            economics, 362                       anticline, 104
            well, 3                              syncline, 104
          extended reach development, 416      footage contract, 80
          extended reach drilling, 69          formation, 281
          extensional plate movements, 19        breakdown, 78
          external constraints, 226              coarse, 78
          external factors, 399                  damage, 408
                                                 density log, 161
                                                 imaging tools, 99, 153
          facilities, 291
                                                 limestone, 78
            design, 129
            engineer, 266                        low strength, 78
            offshore, 423                        overpressured, 79
          failure mode, 321, 323                 permeability, 165
          failures of equipment, 320             porous, 78
                                                 resistivity, 164
          farm-in, 14
                                                 volume factor, 125, 126, 127
          farm-out, 14
          farmed in, 15                          vuggy, 78
          farming out, 15                        water, 132, 267
                                               formation evaluation while drilling, 149
          fast track, 328
          fault, 101                           fractional distillation, 113
            growth, 101                        fractures, 103
            normal, 101                        free gas, 122, 128
                                               free water knock out vessel, 276
            reverse, 101
                                               free water level, 134, 139
            syn-sedimentary, 101
                                               frequency decomposition, 42
            wrench, 101
          faults, 101                          full life cycle cost, 323
          FDP. See field development plan       function-based organisation, 401
                                               FWL. See free water level
          feasibility, 4, 326
            study, 4, 229
          feedstock, 266                       gain access, 9
          FEWD. See formation evaluation while  gaining access, 1, 2
              drilling                         gamma ray, 106
          field                                 gas, 113
            analogues, 223                       calorific value, 126
            development plan, 4                  cap
            development planning, 141, 323         drive, 206
            life cycle, 1                          initial, 206
            management, 385                        secondary, 128
            work, 3                              compression, 283
          first oil, 350                          condensate, 121
          first production date, 205                retrograde, 122
          first-line maintenance, 322             dehydration, 281
          fiscal allowances, 342                  density, 125
          fiscal system, 342                      deviation factor, 124
          fiscal term, 14                         dry, 119
          fiscalisation points, 312               drying, 266
          fishing, 77                             expansion factor, 124, 125
          fixed OPEX, 342                         injection, 293
          flaring, 317                            liberated, 128
          floating production systems, 300        processing, 280, 284
          flooding surface, 154                   recycling, 121
          flowrate, 231                           reservoirs, 210
   444   445   446   447   448   449   450   451   452   453   454