Page 449 - Hydrocarbon Exploration and Production Second Edition
P. 449
436 Subject Index
ethane, 109 fluid
evacuation, 296 contact, 133
expansion reservoir fluids, 202 displacement, 217
expectation curves, 180, 181, 183, 184 flow, 231
expected monetary value, 198, 363 pressure, 133
expenditure, 341, 342 samples, 128, 387
expenditure items, 341 sampling, 151
exploration, 2, 19 folds, 104
economics, 362 anticline, 104
well, 3 syncline, 104
extended reach development, 416 footage contract, 80
extended reach drilling, 69 formation, 281
extensional plate movements, 19 breakdown, 78
external constraints, 226 coarse, 78
external factors, 399 damage, 408
density log, 161
imaging tools, 99, 153
facilities, 291
limestone, 78
design, 129
engineer, 266 low strength, 78
offshore, 423 overpressured, 79
failure mode, 321, 323 permeability, 165
failures of equipment, 320 porous, 78
resistivity, 164
farm-in, 14
volume factor, 125, 126, 127
farm-out, 14
farmed in, 15 vuggy, 78
farming out, 15 water, 132, 267
formation evaluation while drilling, 149
fast track, 328
fault, 101 fractional distillation, 113
growth, 101 fractures, 103
normal, 101 free gas, 122, 128
free water knock out vessel, 276
reverse, 101
free water level, 134, 139
syn-sedimentary, 101
frequency decomposition, 42
wrench, 101
faults, 101 full life cycle cost, 323
FDP. See field development plan function-based organisation, 401
FWL. See free water level
feasibility, 4, 326
study, 4, 229
feedstock, 266 gain access, 9
FEWD. See formation evaluation while gaining access, 1, 2
drilling gamma ray, 106
field gas, 113
analogues, 223 calorific value, 126
development plan, 4 cap
development planning, 141, 323 drive, 206
life cycle, 1 initial, 206
management, 385 secondary, 128
work, 3 compression, 283
first oil, 350 condensate, 121
first production date, 205 retrograde, 122
first-line maintenance, 322 dehydration, 281
fiscal allowances, 342 density, 125
fiscal system, 342 deviation factor, 124
fiscal term, 14 dry, 119
fiscalisation points, 312 drying, 266
fishing, 77 expansion factor, 124, 125
fixed OPEX, 342 injection, 293
flaring, 317 liberated, 128
floating production systems, 300 processing, 280, 284
flooding surface, 154 recycling, 121
flowrate, 231 reservoirs, 210