Page 453 - Hydrocarbon Exploration and Production Second Edition
P. 453

440                                                            Subject Index


          pre-stack and post-stack migration, 38  operations, 311, 312
          pre-stack depth migration, 38          phase, 5
          prediction of overpressures, 136       potential, 407
          preliminary design, 327                primary, 202
          present value, 355                     profile, 5, 224, 230, 267
          pressure, 388                          programmers, 402
            differentials, 76                    support, 291
            drawdown, 238                        target, 399
            hydrostatic, 135                     testing, 237
            measurements, 151                    tubing, 391
            reduction, 281                     production sharing agreement, 9
            regimes, 133                       production sharing contracts, 9, 348
          pressure-depth, 125, 133             productivity, 152, 251
          pressure-depth relationships, 133      improvement factor, 234
          primary production, 202                index, 232, 234, 237, 238
          probabilistic methods, 173           productivity index, 232, 237, 241
          probabilities, 197                   profiling, 25
          probability, 197                     profit oil, 348
            density function, 179              profit-to-investment ratio, 351, 356
            of commercial success, 367         profitability indicators, 357
            of excedence curves, 180           project, 325
            of success, 181, 363                 economics, 5
          procedure                              management
            of pulling out of hole, 55             bar charts, 330
          process                                  budgets, 332
            design, 266                            cost estimation, 332
            engineer, 266                          network analysis, 329
            flow schemes, 269                       planning and control, 329
            model, 268                           net cashflow, 339
          processing                             ranking, 357
            contaminant removal, 282             screening, 357
            downstream gas, 284                propane, 110
            facilities, 280                    prospect, 24
            heat exchanger, 282                PSA. See production sharing agreement
            heavy hydrocarbon removal, 282     PSC. See production sharing contract
            Joule Thomson (JT) throttling, 282
                                               PSDM. See pre-stack depth migration
            liquefied natural gas, 287
                                               PWRI. See produced water re-injectin
            liquefied petroleum gas, 291
                                                   schemes
            low temperature separation, 282
                                               PV ratio, 356
            natural gas liquids, 280, 285
                                               PVT, 115, 266
            oil, 272
                                                 analysis, 131
            refrigeration, 282
            separation, 273
              equilibrium constants, 273       quality assurance, 403
            turbo-expander, 282                quantitative risk analysis, 87
            upstream gas, 280                  QRA. See quantitative risk analysis
          procurement, 327                     Quartz, 97
          produced water re-injectin schemes,
              278, 414
          producing gas oil ratio, 114         radial flow, 231, 233, 234
          product                              ranking process, 194
            quality, 445                       rate dependent process, 222
            quality specification, 312          rate of deformation, 101
            specification, 266, 267             rate of penetration, 54
              gas, 267                         RCI. See reservoir characterisation
              oil, 267                             instrument
              water, 267                       real gas law, 124
          production, 311                      real gases, 124
            intermittent, 415                  real terms, 341, 360, 361
            logging, 388                       real time data, 149
            logging tool, 388                  recombined sample, 131
   448   449   450   451   452   453   454   455   456   457