Page 452 - Hydrocarbon Exploration and Production Second Edition
P. 452

Subject Index                                                         439


             nitrogen, 112, 227, 267, 293          P over z plot, 215
             NMO. See Normal Move Out              palaeontological data, 153
             NOC. See National Oil Companies       palynological data, 153
             non reservoir intervals, 159          paraffinic, 113
             non ring fenced project, 343          paraffins, 110
             non-availability, 396                 parallel engineering, 328
             normal move out, 31, 36               parametric method, 186, 187
             normal pressure regimes, 133          partnering and alliances, 81
             NOS. See net oil sand                 partnering arrangements, 335
             NPV. See net present value            payback time, 350
             nuclear magnetic resonance (NMR), 162, 163  payout time, 350
                                                   penalty clause, 213
             OBC. See ocean bottom cables          pentane, 110
             OBM. See oil based mud                permeability, 23, 97, 165
             OBS. See ocean bottom stations          absolute, 219
             ocean bottom cables, 28                 relative, 219
             ocean bottom stations, 28             permit to work, 87
             offset wells, 48                      petroleum economics, 337
             offtake                               phase behaviour, 115
               limit, 218                          phase diagram, 116
               rate, 223                           phased development, 200
             oil, 2, 113                           phytoplankton, 20
               biodegraded, 24                     PI. See productivity index
               black, 119, 122, 128                PIF. See productivity improvement factor
               compressibility, 126                pigs, 309
               density, 127                        pipeline, 306, 423
               gravity, 114                          blockage, 280
               in water, 276                         bundle, 307
               processing, 272, 278                  corrosion, 280
               properties, 126                       lay barge, 307
               residual, 218                       Piper Alpha
               saturated, 122                        disaster, 86
               shale deposits, 21                  PIR. See profit-to-investment ratio
               undersaturated, 122                 planimeter, 175, 176
               viscosity, 127                      planned shut-down, 397
               volatile, 119, 122, 127             planning, 397, 402
             oil based mud, 58, 165                plate tectonics, 19
             oil formation volume factor, 136      plateau, 205
             oil price forecast, 362                 period, 5
             oil up to, 144                          production, 225
             oil-water contact, 146                  rate, 229
             olefins, 117                           platforms
             on-condition maintenance, 343           concrete, 299
             open hole log data, 146                 gravity based, 298, 299
             operating                               minimum facility systems, 298
               costs, 420                            steel jacket, 298
               expenditure, 342, 359                 structures, 299
               strategies, 421                       temporary storage, 299
             operating expenditure, 319, 342, 359, 398  tension leg, 298, 299
             operations plan, 402                    topside modules, 300
             operations schedule, 402              play, 24
             OPEX. See operating expenditure       plugs, 74
             order of magnitude cost estimate, 332  polymer
             organic compounds, 108                  flooding, 226
             organisational structure, 401           gel, 409
             overbalance, 136                      POOH. See procedure of pulling out of hole
             overburden pressure, 133              pore compaction, 202
             overpressure, 101                     porosity, 23, 96, 97, 161
             overpressured, 135                    portfolio, 7
             oxidising potential, 105              possible gas-oil contact, 135
             oxygen, 113                           pre-drilling, 224
   447   448   449   450   451   452   453   454   455   456   457