Page 312 - Improving Machinery Reliability
P. 312

282   Improving Machinery Reliability

                     (text corrtirirredfionr page 279)

                       Acquisition costs have several branches for the tree as shown in Figure 5-7.
                       Each branch of the acquisition tree also has other branches that are described in
                     detail in such references as SAE (1993) and Fabrycky (1991).
                       Sustaining costs have several branches for the tree as shown in Figure 5-8.
                       What cost goes into each branch of the acquisition and sustaining branches? It all
                     depends on the specific case and is generally driven by common sense. Consider the
                     details under each category.
                                               U
                             mmm
                                                   Acquisition
                                                       Tree
                                                    Cost
                                                       I
                                                -
                                     I
                                                                          1
                                                       I
                             b                                   I-
                              Develo ment Costs
                                                                  Investment Costs
                                                 Investment Costs

                                Program
                                     Management
                             a                                        Upgrades


                                                                    Support Equipment
                                  Advanced
                                        R&D




                                 Engineering Design                 System lntergration
                                                                    OF Improvements




                                   Equipment                       Utility Improvement
                                Development  & Test                     COS&




                                 Engineering Data   Technical Data   Green & Clean Costs


                                          Figure 5-7. Acquisition cost tree.
   307   308   309   310   311   312   313   314   315   316   317