Acquisition costs have several branches for the tree as shown in Figure 5-7.
Each branch of the acquisition tree also has other branches that are described in
detail in such references as SAE (1993) and Fabrycky (1991).
Sustaining costs have several branches for the tree as shown in Figure 5-8.
What cost goes into each branch of the acquisition and sustaining branches? It all
depends on the specific case and is generally driven by common sense. Consider the
details under each category.
U
mmm
Acquisition
Tree
Cost
I
-
I
1
I
b I-
Develo ment Costs
Investment Costs
Investment Costs
Program
Management
a Upgrades
Support Equipment
Advanced
R&D
Engineering Design System lntergration
OF Improvements
Equipment Utility Improvement
Development & Test COS&
Engineering Data Technical Data Green & Clean Costs
Figure 5-7. Acquisition cost tree.