Page 391 - Improving Machinery Reliability
P. 391

Start   Trip   Cause of   Shutdown   Accumulated   Accumulated
 Date   (Hour)   (Hour)   Purpose   Discipline   Shutdown   Tripped by   Time   Oper. Time   Downtime
 (8130)
 8/28   1715   1419   Air dry-out   Instruments   Problems with   RCQ   0.4   241.95   236.80
 RCQ logic
 8/30   1445   1640   Air dry-out   Instruments   Problems with   RCQ   0.25   243.85   237.05
 RCQ logic
 (911)
 8/30   1650   1042   Air dry-out   Instruments   Problems with   RCQ   8.8   261.75   245.85
 Machinery   RCQ logic
 9/ 1   1930   1940   Air dry-out   Mechanical   Gasket in   Manual   4.3   261.90   250.15
 1500# system
 blown
 (914)
 9/2   0000   0100   Air dry-out   Utilities   Loss of   Manual   13.5   310.90   263.65
 boilers
 (915)
 914   1430   1510   Air dry-out   Machinery   Woodward peo-   Manual   0.15   335.55   263.80
 ple worked on
 governor
 915   1520   2040   Ai dry-out   Machinery   Governor   Manual   0.65   340.9   264.45
 vroblem
 Figure 8-1 1. Triplshutdown log.