Page 287 - Introduction to Petroleum Engineering
P. 287
Gather data
Identify parameters
and uncertainties
S.P. Resistivity
Well
Thin Well Electric Seismic
section core log section
50000
1.00
Probabillity that cum oil recorvery will be observed 0.70 Cumulative oil (standard m 3 ) 30000
0.90
40000
Green field
0.80
0.60
0.50
20000
0.40
0.30
0.20
10000
0.10
0.00
600
50000
30 000
20 000
40000
Cumulative oil (standard m ) 3 60 000 0 0 200 400 Time (days) 800 1000 1200
Generate recovery Generate production–injection
distribution forecasts
FIgURE 14.2 Green field flow modeling workflow.