Page 287 - Introduction to Petroleum Engineering
P. 287

Gather data
                                                               Identify parameters
                                                                and uncertainties




                         S.P.  Resistivity
                            Well
        Thin     Well     Electric   Seismic
       section    core      log       section



                                                        50000
               1.00
            Probabillity that cum oil recorvery  will be observed  0.70  Cumulative oil (standard m 3 )  30000
               0.90
                                                        40000
                               Green field
               0.80
               0.60
               0.50
                                                        20000
               0.40
               0.30
               0.20
                                                        10000
               0.10
               0.00
                                                                      600
                               50000
                     30 000
                20 000
                          40000
                     Cumulative oil (standard m ) 3  60 000  0  0  200  400  Time (days) 800  1000  1200
                     Generate recovery                      Generate production–injection
                        distribution                                forecasts
                          FIgURE 14.2  Green field flow modeling workflow.
   282   283   284   285   286   287   288   289   290   291   292