Appendix 4-C

                          Detailed Checklist for  Rotating

                                Equipment:  Pump Piping

















                                                                            DATE/BY
                         1.   VALVES  ACCESSIBLE.
                         2.   INSTRUMENTATION  VIEWABLE  AND  ACCESSIBLE.
                         3,   VALVES,  GLANDS.  AND  INSTRUMENTATION  TAGGED.
                         4.   SEAL  POTS  AND  PIPING  ADEQUATELY  SUPPORTED.
                             MAXIMUM   UNSUPPORTED  SPANS:
                             1/2  INCH  LINE  -  2'  0''
                             3/4  INCH  LINE  - 2'  6"
                             1  INCH  LINE  -  3'  0''
                         5.   SEAL  FLUSH  PIPING  PER  API  PLAN   .  SKETCH
                             ATTACHED.
                         6.   AUXILIARY   FLUSH  PIPING  PER  API  PLAN
                             SKETCH  ATTACHED.
                         7.   COOLING  WATER  PIPING  PER  API  PLAN   I
                             SKETCH ATTACHED.
                         8.  SEAL  POT(S)  AND  PIPING   FREE  OF  SCALE  AND  DIRT.
                         9.   SEAL  POT(5)  FILLED TO  MIDDLE  OF  SIGHT  GLASS.
                        10.   PIPE  THREAD  SEAL  WELD  COVERS  ALL  THREADS.  1/4
                             INCH  MINIMUM  WELD.