Page 80 - Mathematical Models and Algorithms for Power System Optimization
P. 80

70   Chapter 3


                                                    Start



                                                1  Input GMS data  *.DAT



                                             2  Form general information



                                          3  Determine the maintenance priority



                                            4  Form equivalent load curve



                                         5  Calculate the reserve margin of the system



               Fuzzy performance index and fuzzy  6  GMS scheduling          Expert system rules
                   constraint boundary




                                             Output the  Output result list  *.OUT
                                             result curve  file



                                                    End

                                                  Fig. 3.10
                      Optimization calculation procedure of generator maintenance scheduling.
                        Note: * may be any character string given by the user (up to 20 bytes).

            the GMS under the condition of satisfying the fuzzy constraints. Lastly, the GMS results are
            output.

            The calculation procedure of generator maintenance scheduling is shown in Fig. 3.10. The file
            types of generator maintenance scheduling are as follows:
            (1)  GMS input data file type: *.DAT.

            (2)  GMS output list file type: *.OUT.
   75   76   77   78   79   80   81   82   83   84   85