Page 80 - Mathematical Models and Algorithms for Power System Optimization
P. 80
70 Chapter 3
Start
1 Input GMS data *.DAT
2 Form general information
3 Determine the maintenance priority
4 Form equivalent load curve
5 Calculate the reserve margin of the system
Fuzzy performance index and fuzzy 6 GMS scheduling Expert system rules
constraint boundary
Output the Output result list *.OUT
result curve file
End
Fig. 3.10
Optimization calculation procedure of generator maintenance scheduling.
Note: * may be any character string given by the user (up to 20 bytes).
the GMS under the condition of satisfying the fuzzy constraints. Lastly, the GMS results are
output.
The calculation procedure of generator maintenance scheduling is shown in Fig. 3.10. The file
types of generator maintenance scheduling are as follows:
(1) GMS input data file type: *.DAT.
(2) GMS output list file type: *.OUT.