Page 247 - Mechanical Engineers' Handbook (Volume 2)
P. 247

Step     7%          to  and  200  at  lot  a  the  at  100  PR1  consumption  to  which  There  and  5  lost  was  probably
                  Previous  materials  had  process  process  processed  from  to  package  to  had  PR1  to  package  process  and  PR1  possibly  1,  process,  was


                  with   raw  to  4:00–5:00  through  intermediate  was  was  and  delivered  match  package  match  example,  in  pieces  through  breakdown,  package.  example,  was  PF1  warehouse  goods  and
                  Data   match  at  plant  lag  PR1  1  lot  when  to  to  this  5  lag  finished  this  In  PF1.  in  finished  degrees,

                  Combine  to  ID  run  to  time  from  package  from  detected  package  creation;  package  in  lost  1,  time  from  this  mixing.  for  stored  into  200  at


                  to     batch  material  delivered  manufacture,  characteristics  lots;  created  rejects  package  inventory;  warehouse  manufacture,  characteristics  sourced  sources  degrees,  loading
                  Query  material  when  of  materials  was  5%  intermediate  intermediate  from  of  packages  significant  be  would  400  at  when  processed  1

                  Simplified  raw  Use  characteristics;  rejects  time  Use  identify  raw  degrees,  had  that  plant  of  ID  Use  intermediate  pieces  of  ID  Use  intermediate  came  time  Use  identify  raw  be  may  PR2  created  pieces  probably  lot  from






                     rejects  1;  lot  degrees  2;  lot  in  100  4:10–  1  at  400  390  395  410  6:  from  grade;

                     7%  from  200  from  205  time  3:30–4:10;  created:  warehouse  consumed  pieces;  pieces;  pieces;  pieces;  :15  created  prime
                  Data  2:  rejects;  rejects;  PR2              147         time  pieces;
                  Example  lot rejects;  materials  raw  10  materials  raw  14  residence  :10  created:  package  pieces  location  packages  95  PR1;  PR2;  25  PR3;  40  PR4;  residence  PF1  package  40



                     5%    pieces;  pieces;  PR1  150  PR1  breakdown:  5:30–6:00  degrees  6:00–6:30  degrees  6:30–6:40  degrees  6:40–7:00  degrees  6:30;  to  PO5670
                     1:  3:00–4:00  1000  4:00–5:00  1045  degrees;  process  Package  pieces;  5:10;  Package  Intermediate  Typical  Finished  00  order
                     Lot

                       inventory  consumed;  end  and  delay  downgrades,  rate,  materials  start/end  dimensions  ID  intermediate  of  time  downgrades,  rate,  materials  start/

                  (Typical)  ID  batch  in  time  lots  start  time  as  such  to  ID,  package  ID,  start/end  through  as  such  to  ID;  package  order



                  Data  material  quality,  material  ID;  process;  rejects,  modifications  package  package  inventory  batch  delay  rejects,  modification  package  creation  grade,  customer
              Queries  Important  raw  raw  batch  to  entry  process  count,  characteristics  raw  creation  count,  intermediate  in  finishing  consumed,  time  count,  characteristics  finished  of  count,


              Sample  Identifiers:  supplier,  Identifiers:  material  raw  of  time  through  piece  process  temperature,  Identifiers:  of  time  piece  Identifier:  location  Identifer:  package  consumption;  process  piece  process  temperature,  Identifiers:  time  end  piece  dimensions,


              Chain    Data:     Data:     Data:     Data:       Data:             Data:
              Data  Process                              goods                 goods


              10  in  material  inventory  Intermediate  goods  processing  Intermediate  package  creation  Intermediate  inventory  processing  package  creation
              Table  State  Raw                          Finished              Finished



           236
   242   243   244   245   246   247   248   249   250   251   252