Page 287 - Mechatronics for Safety, Security and Dependability in a New Era
P. 287

Ch55-I044963.fm  Page 271  Tuesday, August 1, 2006  9:39 PM
                      Page 271
                                           9:39 PM
                            Tuesday, August 1, 2006
            Ch55-I044963.fm
                                                                                          271
                                                                                          111
                            INTEGRATED         CONSTRUCTION           PROCESS
                                       MANAGEMENT           SYSTEM

                                                  1
                                     Masayuki  Takata ,  Eiji  Arai  2  and Junichi  Yagi 3
                             1 Information  Processing  Center, The Univ.  of Electro-Communications
                                          Chofu-shi,  Tokyo  182-8585, Japan
                                 2 Department  of Manufacturing  Science,  Osaka  University
                                           Suita-shi,  Osaka  565-0871, Japan
                                     3 Institute  of Technology,  Shimizu  Corporation
                                           Koto-ku,  Tokyo  135-8530,  Japan



                  ABSTRACT

                  This paper  describes  an implementation  of an Integrated  Construction  Process  Management Sys-
                  tem,  which includes both  manufacturing  process management  features  for building parts  and also
                  construction  progress  management  features  at construction  site.  To monitor the flow  of the build-
                  ing  parts,  RFIDs  are stuck  to  all  of the parts  to be managed,  and several  checkpoints,  which
                  we named  "gates",  are introduced  within the coherent  process  through  part-manufacturing  plant
                  line,  logistic  processes  and building  construction  processes.  By means  of this,  building  parts can
                  be  tracked  certainly,  and anyone  can know the status  and the location  of building  parts  at  that
                  instant.


                  KEYWORDS

                  integrated  process  management  system,  part-manufacturing  process  management,  building con-
                  struction  process management,  intensive data  management  system


                  1  INTRODUCTION

                  This paper describes an implementation  of the integrated construction process management  system,
                  which  includes  manufacturing  process management  features  for building  materials,  and construc-
                  tion  process  management  features  at  construction  site.  Recently,  RFIDs  are getting  popular in
                  logistics  and manufacturing  industries.  The process  management  system  for  building  construc-
                  tion and building materials  manufacturing  must  cover these two aspects, and the use of RFIDs in
                  construction  industries  will  make the trace-ability  of the building  materials  more  accurate.  The
                  system  we aimed  enables  efficient  project  management  and diminish the loss in the construction,
                  by  providing  all information  of the both  material  manufacturing  and building  construction  to all
                  of material  designing, material  manufacturing,  building  designing and building  construction  sites.
   282   283   284   285   286   287   288   289   290   291   292