Page 239 -
P. 239

232                                                    S. Clemens et al.


























                           Fig. 8.11 Step one: choosing how to offer, allocate, and start a work item


























                           Fig. 8.12 Step two: specifying the distribution set for work item offering



                              In some cases it may be required to defer the choice of which participant will
                           get offered a particular work item until runtime. This can be done by setting the
                           offering to user-initiated, to allow a user with offering rights (e.g., an administrator)
                           to determine whom the work item is to be offered to at runtime. Alternatively, the
                           Editor enables the use of a variable to store the participant’s user identification (late-
                           binding). The variable can be specified within step two of the wizard. In the subnet
   234   235   236   237   238   239   240   241   242   243   244