Background 425
Installation Name
Document No.
Verification Scheme, Written Scheme of
Examination & Test or Combined Scheme?
Verification Scheme Combined Scheme
Item PFEER WSET Comments
Overview of the hazard management process n/a
Details of the PFEER assessment n/a
Description of responsibilities for development
and implementation of the scheme
Description of how verification/examination
process is managed
Criterion used for ICP selection n/a
Communication of information relevant to
verification between all relevant parties
Review and revision of the scheme
Description of how results of examinations are
recorded
Issue of reports
Procedure for distribution of reports
Descrption of interface with PFEER WSET n/a
Description of interface with Well Examination n/a
Scheme
Description of verification arrangements for:
Temporary Equipment n/a
Combined Operations n/a
Major Projects/Installation Modifications
Description of the interface with Classification
Record of Safety and Evironmentally Critical n/a
Elements
A description of the links between the Major
Accident Hazards and Safety and n/a
Environmentally-Critical Elements
Identification of all PPE and Plant to be n/a
examined
Performance Standards included?
Activity list (following included):
Examination activity to be performed
Extent of ICP involvement
When the activity is to be done and how
often is it repeated
Unique ID for activity
Reference to Performance Standard and Safety
and Environmentally Critical Element
List of documentation required for
verification
Identification of other activities for which
credit is taken
Reviewed by: Approved by:
Date: Date:
FIGURE 9.1.2
Written scheme checklist.