The Zeepipe  challenge


      prior to commencement of the precommissioning and commissioning opera-
      tions.




         CONCLUDING           REMARKS


         By adopting the long-distance pigging concept, both the  precommissioning
      and commissioning operations  have been  significantly simplified. The need
      for  a  midline  platform  on  the  Sleipner  to  Zeebrugge  pipeline  has  been
      eliminated, and more cost-effective alternatives are introduced for the future
      compressor  platform  tie-in.  This has further  reduced  the  maintenance re-
      quirement, and also eliminated intermediate  pig handling during the  opera-
      tional phase.



         ACKNOWLEDGEMENT



         Zeepipe  is organized  as a joint venture  with  the  following  ownership
      configuration:

         Company                                              Ownership  (%)

         Den norske stats oljeselskap A/S(Statoil)                  70'
         Norsk Hydro produksjon A/S                                 8
         A/S Norske Shell                                           7
         Esso Norge A/S                                             6
         Elf Aquitaine Norge A/S                                     3.2985
         Saga Petroleum A/S                                         3
         Norsk Conoco  A/S                                           1.7015
         Total Marine Norsk A/S                                     1

         "Including  direct Norwegian state economic participation  of  55%.

         Statoil is the operator of the  Zeepipe joint  venture.