Ethylene pipeline cleaning


     pressure  drops,  friction  factor  comparison,  and  roughness  calculations.
     Removable   test  spool  pieces  will  be  installed  on  the  pipeline  to  further
     monitor the deposition  rate. A long-term objective is to better understand the
     polymer  formation mechanism.

        Future programmes


        With this project's  successful conclusion  and the  restoration  of  pipeline
     capacity,  AGEC  will  be  investigating  a  future  on-line  ethylene  cleaning
     programme to maintain pipeline capacity.  Corrosion  rate predictions  deter-
     mined by Novacorp are presently  being  analyzed to develop  an  inspection
     programme that will ensure a continued  high level of integrity is maintained.

        Safety and public relations



        Great efforts  were  made on this project  to provide  a safe work  environ-
     ment and promote   good public  relations.
        One  minor  recordable  injury  resulted  during  the  60,000  man-hours  of
     work, and two public complaints were  received.



        ACKNOWLEDGEMENTS


        Novacorp   International  Consulting  Inc  wishes  to  acknowledge,  with
     thanks, the help and co-operation afforded  by the  following:

           John  Duncan, P.Eng.
           Lucie Zillinger, P.Eng.


















                                       203
   217   218   219   220   221   222   223   224   225   226   227