Page 222 - Pipeline Pigging Technology
P. 222
Ethylene pipeline cleaning
pressure drops, friction factor comparison, and roughness calculations.
Removable test spool pieces will be installed on the pipeline to further
monitor the deposition rate. A long-term objective is to better understand the
polymer formation mechanism.
Future programmes
With this project's successful conclusion and the restoration of pipeline
capacity, AGEC will be investigating a future on-line ethylene cleaning
programme to maintain pipeline capacity. Corrosion rate predictions deter-
mined by Novacorp are presently being analyzed to develop an inspection
programme that will ensure a continued high level of integrity is maintained.
Safety and public relations
Great efforts were made on this project to provide a safe work environ-
ment and promote good public relations.
One minor recordable injury resulted during the 60,000 man-hours of
work, and two public complaints were received.
ACKNOWLEDGEMENTS
Novacorp International Consulting Inc wishes to acknowledge, with
thanks, the help and co-operation afforded by the following:
John Duncan, P.Eng.
Lucie Zillinger, P.Eng.
203