Page 219 - Pipeline Pigging Technology
P. 219

Pipeline  Pigging  Technology











































                      Fig.6. Summary of   inspection runs.

     safe passage. However, problems did occur for the corrosion vehicles due to
     some heavy-wall tees with internal diameters less than the allowable. Indica-
     tions are that the  calliper log did indicate the  restrictions;  however,  more
     careful interpretation would have been required to highlight these. Likewise
     for the profile tools; it was a difficult task to determine what was normal wear
     on the  gauge plates and what was the result of a mild diameter  restriction.
     Particular care must be taken to evaluate all the information thoroughly and
     collectively.
        A nitrogen line pack of 3500kPa was used to prevent  tool surge. This is
     somewhat   lower  than  at  first  thought  necessary,  yet  it  proved  to  work
     consistently well for all inspection  runs. Only one velocity excursion  was



                                       200