Installation Design 181 PIPE OVERBEND PIPE SAGBEND FAEESPAN Figure 12.3 Typical pipe configuration during installation. CONTROLLED DEPTH TOW METHOD LEADING TUG TRAILING TUG PATROL VESSEL I J-TOWWIRE SEABED Figure 12.4 Flowline Tow method.