246   Major Process Equipment Maintenance and Repair

                     ening the bolts, check for distortion by placing a dial indicator on the
                     gear housing foot near the bolt to be checked. If the housing foot moves
                     when the bolt is loosened, then distortion is present, and the housing
                     needs more shims around the bolt. The gear housing should be checked
                     for distortion using this method at each foundation bolt.
                       After the gear unit is properly aligned to the first component and bolted
                     down free of distortion, a soft blue tooth contact check should be per-
                     formed. If the contact pattern is satisfactory, then proceed with the instal-
                     lation. However, in the event that the soft blue check indicates poor tooth
                     contact, shaft and coupling alignment and housing distortion should be
                     rechecked before proceeding with installation.
                       Before operating the gear unit, dowel it to the base or soleplate as rec-
                     ommended by the manufacturer, leaving room to redowel if necessary.
                     Doweling a gear unit before operating is very important since, as a gear
                     unit is heated and cooled, it will crawl on the mounting surface and an
                     alignment change may result. If instructions are not available from the
                     manufacturer, dowel the unit under the shaft for which alignment is the
                     most critical.
                       After doweling the gear unit, apply layout blue to the teeth as directed
                     for a hard blue tooth contact check, and then start the unit up and operate
                     it for a short period of time. NO272 Care should be taken in joining the
                     two coupling halves to observe any coupling match marks. Lubricate the
                     coupling and check for free axial movement of pinion and gear. After
                      shutting the unit down, check the tooth contact pattern as evidenced by
                     the wear-off of the bluing. If a satisfactory contact pattern is obtained,
                     proceed with installation. However, should the contact pattern be poor,
                     corrective measures should be taken as recommended by the manufac-
                     turer before going on with installation.
                       At this time, a hot alignment check should be made by running the gear
                     package until temperatures stabilize, shutting it down, and taking indica-
                     tor readings while the gear package is hot. Any  corrections necessary
                      should be made while the unit is still hot.  After complete correct hot
                      alignment is obtained and before the package cools off, the gear unit
                      should be  redoweled to the foundation or base.  When  final coupling
                      alignment has been established and the gear has been redoweled, place
                      the coupling guards in position. Mzrning: Failure to use coupling guards
                      may result in serious injury to personnel.
                        Succeeding the installation of the gearbox, the installation of the third
                      machine element should follow along the same basic lines. Again, after
                      alignment has been completely finalized, coupling guards should be in-
                      stalled for protection.
                        When the entire machinery package has been completely and satisfac-
                      torily installed, it should be started up and operated. Special attention
   259   260   261   262   263   264   265   266   267   268   269