Page 84 - Practical Machinery Management for Process Plants Major Process Equipment Maintenance and Repair
P. 84
Installation, Maintenance, and Repair of Horizontal Pumps 69
,.:12.
DETAILED CHECKLIST FOR ROTATING EQUIPMENT:
CENTRIFUGAL PUMP RUN-IN
MACHINE TAG NO.
DATE/BY
20. ABSENCE OF LEAKS ON CONNECTIONS AND PIPE
FLANGES.
21. OBSERVED DATA TAKEN DURING RUN-IN.
BEG.
AMP.
LOAD CURRENT - -
MIL.
DISP. (P-P) MOTOR. IN/OUT - -
VEL. MOTOR, IN/OUT - - IN./SEC9
MIL.
DISP. (P-PI, IN/OUT - -
VEL. PUMP, IN/OUT - - IN./SEC,
NOISE - -
DBA
22. FOUR HOUR RUN-IN COMPLETED.
23. SHUT DOWN PER RUN-IN PROCEDURE.
DATE FILE REFERENCE
MACHINERY RELIABILITY PROGRAM
3/20/84 PAGE 2 OF 2