Page 84 - Practical Machinery Management for Process Plants Major Process Equipment Maintenance and Repair
P. 84

Installation, Maintenance, and Repair of Horizontal Pumps   69






                     ,.:12.
                                DETAILED  CHECKLIST  FOR  ROTATING  EQUIPMENT:
                                        CENTRIFUGAL  PUMP  RUN-IN

                               MACHINE TAG  NO.
                                                                         DATE/BY
                     20.   ABSENCE  OF  LEAKS  ON  CONNECTIONS  AND  PIPE
                          FLANGES.
                     21.   OBSERVED  DATA  TAKEN  DURING  RUN-IN.
                                             BEG.
                                                                            AMP.
                     LOAD CURRENT            -                         -
                                                                            MIL.
                     DISP.  (P-P)  MOTOR.   IN/OUT   -                 -
                     VEL.  MOTOR,   IN/OUT   -                         - IN./SEC9
                                                                            MIL.
                     DISP.   (P-PI,   IN/OUT   -                       -
                     VEL.  PUMP,  IN/OUT     -                         - IN./SEC,
                     NOISE                   -                         -
                                                                            DBA
                     22.  FOUR HOUR  RUN-IN  COMPLETED.
                     23.   SHUT  DOWN  PER  RUN-IN  PROCEDURE.





















                        DATE                                           FILE REFERENCE
                                     MACHINERY  RELIABILITY  PROGRAM
                      3/20/84                                           PAGE  2  OF  2