Page 388 - Practical Power System and Protective Relays Commissioning
P. 388

management  Months Required Required  Days Engineers  6  5  4  3  2  1  X  1  A  X  1  A  X  1  A  and  X  1  B  X  X  33  C  15  X  30  D  X  30  D  X  20  F  X  X  20  C  kV  X  10  C  X  24  G  X  24  G  X  3  G  (Continued)


               resources        continuity  trays  panels  11  220,  SWG  kV



               and              cable   control         500,  220  and  test  test  station
               time          measurements  cables,  and  panels  interlocking  500  S/S  stability  stability  test

               substation       control  charges  relays  kV  control  and  and  of  tests  transformer  transformer  transformer



               of         inspection  resistance  and  services  test  battery  and  220  and  relays  tests  kV  kV  indication  injection  kV  kV  auxiliary
               Summary  Activity  General  earth  Power  insulation  Batteries  kV  500  kV  11  500  GIS  200  GIS  SWG  kV  Operation  Primary  500/220  220/220  kVA)  (500



               23.2          S/S                    11

               TABLE  Number  1  2  3  4  5   6  7  8   9  10  11  12  13