Months 2 1 X X X X X X X X X X
Required Days 1 1 1 1 33 15 30 30 20 20 10 24 24 3
Required Engineers A A A B C D D F C C G G G
management and kV
resources continuity trays panels 11 220, SWG kV
and cable control 500, 220 and test test station
time measurements cables, and panels interlocking 500 S/S stability stability test
substation control charges relays kV control and and of tests transformer transformer transformer
of inspection resistance and services test battery and 220 and relays tests kV kV indication injection kV kV auxiliary
Summary Activity General earth Power insulation Batteries kV 500 kV 11 500 GIS 200 GIS SWG kV Operation Primary 500/220 220/220 kVA) (500
23.2 S/S 11
TABLE Number 1 2 3 4 5 6 7 8 9 10 11 12 13