Page 383 - Practical Power System and Protective Relays Commissioning
P. 383

Required  Days                          10      24





                  Duration  Days  1  1  A  10  A  10  C  10  A  5  A  5  C  5  10  B  3  B  3




                  Labor   1  1    1    1    1    1   1       1       1    1


                  Technician  1  1  1  1  1  1   1   1       1       1    1





                  Engineer  1                                1








                                                             and
                                                             protection


                                                             all  check
                             check  check  check             of
                          SWG                                check  SWG  insulation  check
                       check  11 kV  annunciator  annunciator  annunciator  S/S  of  circuits  insulation

                       operation  of  test  and  and  and  test  test  test  test  secondary  220 kV  and  transformer  test  motor

              (Continued)  Activity  changer  protection  alarm  500 kV  alarm  220 kV  alarm  11 kV  interlock  500 kV  interlock  220 kV  interlock  11 kV  injection  Primary  ratio,  500 metering  kV  500/220  transformer  Power  fan  Cooling





              23.1     Tap  Arc                              CT
              TABLE  Number  9.4  9.5  9.6  9.7  9.8  9.9  9.10  9.11  10  10.1  11  11.1  11.2