Required
                    Days
                                                          10
                  Duration
                    Days
                                         10
                                    10
                               10
                                  A
                                       C
                             A
                                                     C
                                                       5
                                                A
                                            A
                                                   5
                       1
                                              5
                          1
                  Labor
                                                     1
                                  1
                                       1
                                                 1
                                            1
                             1
                          1
                  Technician
                             1
                       1
                                            1
                                                 1
                                  1
                          1
                                       1
                                                     1
                  Engineer
                       1
                                                             and  10  1  1  1  24  B  1  1  3  B  1  1  3
                                                             protection
                                                             all  check
                             check  check  check             of
                          SWG                                check  SWG  insulation  check
                       check  11 kV  annunciator  annunciator  annunciator  S/S  of  circuits  insulation
                       operation  of  test  and  and  and  test  test  test  test  secondary  220 kV  and  transformer  test  motor
              (Continued)  Activity  changer  protection  alarm  500 kV  alarm  220 kV  alarm  11 kV  interlock  500 kV  interlock  220 kV  interlock  11 kV  injection  Primary  ratio,  500 metering  kV  500/220  transformer  Power  fan  Cooling
              23.1     Tap  Arc                              CT
              TABLE  Number  9.4  9.5  9.6  9.7  9.8  9.9  9.10  9.11  10  10.1  11  11.1  11.2
   377   378   379   380   381   382   383   384   385   386   387