Page 380 - Practical Power System and Protective Relays Commissioning
P. 380

20
              30
                       5
                    C
                    1
                    1
                         and  C  1  1  10  C  1  1  5  C  1  1  10  C  1  1  5  C  1  1  5  C  1  1  20  C  1  3  20  A  1  1  5  A  1  1  5  C  1  1  10  (Continued)
                         circuits                             SWG  SWG  SWG
                         VT                                   kV   kV   kV
                         and                                  500  220  220
                         CTs  CTs                             for  for  for
              (6)        of   of                           test
              in                                 check        check  check  check
              above  resistance  resistance  measurement  curve  interlocking
              as           point        CT  of   ratio        indication  indication  indication
              same  gear  contact  insulation  earthing  VT  and  and  and  and  and

              GIS  switch  and  of  of  resistance  characteristic  test  check  indication
              220 kV  11 kV  insulation  CTs  of  VTs  of     operation  operation  operation

              of  of     Meaurement  confirmation  winding  test  Excitation  test  High-voltage  scheme  Operation
              Test  Test  CB  DC   Kick      Kick     CB      System  System  System




                    8.1  8.2  8.3  8.4  8.5  8.6  8.7  8.8    9.1  9.2  9.3
              7  8                                         9
   375   376   377   378   379   380   381   382   383   384   385